CO2 Solutions (Saipem)
St-Félicien, Qc - 2018
• Design and manufacture of pressure vessels and piping including absorber and stripper columns 120 and 140 feet long
• Manufacture and installation of piping
• Installation of mechanical equipment carried out by Alco-TMI Construction